-
Kuo-Jung Su authored
This patch makes the minimum power-on delay for USB HUB become configurable. The original design waits at least 100 msec here, but some EHCI controlers(e.g. Faraday EHCI) are known to require much longer delay interval. Signed-off-by:
Kuo-Jung Su <dantesu@faraday-tech.com> CC: Marek Vasut <marex@denx.de>
Kuo-Jung Su authoredThis patch makes the minimum power-on delay for USB HUB become configurable. The original design waits at least 100 msec here, but some EHCI controlers(e.g. Faraday EHCI) are known to require much longer delay interval. Signed-off-by:
Kuo-Jung Su <dantesu@faraday-tech.com> CC: Marek Vasut <marex@denx.de>